There is an obvious engineering screw up at the marina that the boat is docked. More than 50% of the finger docks separted from the main dock. Both the main dock and the finger docks float..I don't think that anyone took into account that from and to end (including the main dock) is 50+ feet. All the connections to the main dock are (were) rigid. With the waves and swell last night they failed. Boats were tied to docks that were not secured. My boat is now tied to the pileings, and then to the main dock and the finger dock. The Bertram is keeping it all together until I get it out of there tomorrow. Bless the "best boat that was ever built". Right UV????...