| |
Bertram31.com General Bulletin Board
How Much Epoxy do I need?
Posted By: Ian Upton
Date: Tuesday, 7 June 2005, at 4:13 p.m.
I have cut new bulkheads for my B20 project out of 3/4 teak plywood and want to use Patrick's method of epoxy sealing before varnish.
Basically I have 1 4'X8' sheet of plywood that needs to be saturated before varnish.
The epoxy that I have in the area is System Three and I can get it in 1.5 and 3 quart kits.
Will I need more than 1.5 quarts to do the saturation?
Thanks,
Ian.
| |
Bertram31.com General Bulletin Board is maintained by Patrick McCrary with WebBBS 5.12.